{"id":1004,"date":"2016-07-12T07:33:25","date_gmt":"2016-07-12T07:33:25","guid":{"rendered":"https:\/\/www.isco-sc.it\/internazionale\/it\/?p=1004"},"modified":"2025-08-12T06:22:13","modified_gmt":"2025-08-12T06:22:13","slug":"1004","status":"publish","type":"post","link":"https:\/\/internazionale.isco-sc.it\/it\/1004\/","title":{"rendered":"APEP \u2013 PROGETTO DI SOSTEGNO ALL\u2019ISTRUZIONE PRIMARIA \u2013 FASE 2"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"300\" height=\"125\" src=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-0-MinEPS-Afd-fr-300x125-1.jpg\" alt=\"\" class=\"wp-image-1477\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>PAESE\/ZONA:&nbsp;<\/strong>REPUBBLICA DEMOCRATICA DEL CONGO \u2013 PROVINCIA DEL CONGO CENTRALE<\/p>\n\n\n\n<p><strong>PROGETTO:&nbsp;<\/strong>APEP \u2013 PROGETTO DI SOSTEGNO ALL\u2019ISTRUZIONE PRIMARIA \u2013 FASE 2<br>CONTRATTO N\u00b0 19\/AFD\/MINEPS-INC\/C2D\/APEP2\/2016<\/p>\n\n\n\n<p><strong>FINANZIAMENTO:&nbsp;<\/strong>AGENZIA FRANCESE PER LO SVILUPPO<\/p>\n\n\n\n<p><strong>COMMITTENTE:&nbsp;<\/strong>MINISTERO DELL\u2019ISTRUZIONE PRIMARIA, SECONDARIA E INTRODUZIONE ALLA NUOVA CITTADINANZA\u2013 RDC<\/p>\n\n\n\n<p><strong>COSTO DELL\u2019AZIONE:&nbsp;<\/strong>(USD 626.559) EURO 549.606<\/p>\n\n\n\n<p><strong>PERIODO:&nbsp;<\/strong>LUGLIO 2016 \u2013 GENNAIO 2018<\/p>\n\n\n\n<p><strong>RUOLO DI ISCO<\/strong>: AGENZIA LOCALE D\u2019ESECUZIONE<\/p>\n\n\n\n<p><strong><u>Descrizione sintetica del progetto:<br><\/u><\/strong>Nell\u2019ambito di questo progetto, I.S.CO. \u00e8 incaricata alla costruzione e dell\u2019arredamento di 6 scuole primarie nel territorio di Lukula, provincia del Congo Centrale. Questo contratto rientra nel Programma APEP 2 (Sostegno all\u2019Istruzione Primaria \u2013 Fase 2) del Ministero dell\u2019Istruzione Primaria, Secondaria e Introduzione alla nuova Cittadinanza della Repubblica Democratica del Congo, finanziato dall\u2019AFD, Agenzia francese per lo sviluppo.<br>I 6 edifici scolastici saranno composti, in totale, di 40 classi, che permetteranno di ospitare fino a 2.000 allievi. Il contratto prevede anche la costruzione di uffici amministrativi e di servizi igienici.<br>Qui di seguito i complessi scolastici che saranno costruiti:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>EP Lemba<\/li>\n\n\n\n<li>EP Kiidma<\/li>\n\n\n\n<li>EP Kito<\/li>\n\n\n\n<li>EP Lukula<\/li>\n\n\n\n<li>EP Matondo<\/li>\n\n\n\n<li>EP Kimpwanza<\/li>\n<\/ul>\n\n\n\n<p>L&#8217;inizio dei lavori \u00e8 previsto per settembre 2016, con una durata prevista di non oltre venti mesi.<\/p>\n\n\n\n<p><strong><u>Metodologia:<br><\/u><\/strong>La realizzazione delle opere sar\u00e0 fatta con un forte coinvolgimento delle comunit\u00e0 beneficiarie che contribuiranno, sotto forma di manodopera, principalmente nella produzione dei mattoni necessari per la costruzione. Questi volontari saranno seguiti da personale specializzato di I.S.CO. che avr\u00e0 il compito di garantire la qualit\u00e0 delle opere. L\u2019apertura dei sei cantieri sar\u00e0 preceduta dalla realizzazione di un &#8220;cantiere scuola&#8221;, gestito dal Ministero, che consentir\u00e0 la formazione del personale sulla tecnica di produzione e di posa di mattoni in terra compressa e stabilizzata (BTCS).<br>Questa strategia attuata dal Ministero, che prevede la partecipazione diretta dei beneficiari per la realizzazione dei lavori, s\u2019inserisce perfettamente nella metodologia abitualmente adottata da I.S.CO. per promuovere il pi\u00f9 possibile le risorse umane ed i materiali locali, in un ottica di appropriazione degli interventi da parte delle comunit\u00e0 stesse.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"720\" height=\"540\" src=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-1.jpg\" alt=\"\" class=\"wp-image-1479\" srcset=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-1.jpg 720w, https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-1-300x225.jpg 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><figcaption class=\"wp-element-caption\">Una scuola primaria nel territorio di Kenge (Provincia del Kwango) dopo la ricostruzione nell\u2019ambito del progetto APEP (fase 1)<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-2.jpg\" alt=\"\" class=\"wp-image-1481\" srcset=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-2.jpg 600w, https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-2-300x225.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Esempio: la stessa scuola prima della ricostruzione<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"427\" src=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-3.jpg\" alt=\"\" class=\"wp-image-1484\" srcset=\"https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-3.jpg 640w, https:\/\/internazionale.isco-sc.it\/wp-content\/uploads\/2016\/07\/Foto-3-300x200.jpg 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><figcaption class=\"wp-element-caption\">Fabbricazione di mattoni di terra compressa e stabilizzata (BTCS) utilizzando una pressa<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p><strong>Paese: <\/strong>REPUBBLICA DEMOCRATICA DEL CONGO &ndash; PROVINCIA DEL CONGO CENTRALE<\/p>\n<p><strong>Periodo:<\/strong> LUGLIO 2016 &ndash; GENNAIO 2018<\/p>\n<p><strong>Finanziamento: <\/strong>AGENZIA FRANCESE PER LO SVILUPPO<\/p>\n","protected":false},"author":1,"featured_media":1388,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32,34],"tags":[],"class_list":["post-1004","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-progetti-conclusi","category-tutti-i-progetti"],"_links":{"self":[{"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/posts\/1004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/comments?post=1004"}],"version-history":[{"count":3,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/posts\/1004\/revisions"}],"predecessor-version":[{"id":1486,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/posts\/1004\/revisions\/1486"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/media\/1388"}],"wp:attachment":[{"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/media?parent=1004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/categories?post=1004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/internazionale.isco-sc.it\/it\/wp-json\/wp\/v2\/tags?post=1004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}